![]() ![]() ![]() NEA's Clearance Certificate for the detailed plans on Environmental Health.Calculation of holding tank capacity, sectional plan and letter of award for licensed waste collector (if proposed).Proposed point of connection to inspection chamber, public sewer or proposed holding tank (SIP is required when connection is made to public sewer or holding tank).Temporary sanitary/ layout of toilet(s).generated by the system and quote this number for all future correspondences related to this application.Ī response/approval will be sent to the applicant’s email or fax number as provided by the applicant in the form within 7 working days.Īll relevant information shall be submitted with the application including the following: You will be prompted by a system message if your application has been successfully received. ![]() The Department may carry out audit inspection to the completed works. ![]() Upon completion of the works, the applicant shall notify PUB, Water Reclamation (Network) Department (WRN) via online Form H (Notification for Completion of Minor Sewerage Works) and submit Form G (Application for Adjusting Sanitary Appliances Fees) to declare the quantity of sanitary fittings installed. Form B can be submitted through email at by contractor / plumber or through Corenet-e-submission system by QP. This e-service facilitates the QP/ Contractor/ Plumber on the application to PUB for the connection of temporary toilet/ sanitary facilities at construction sites to public sewers or approved sewerage systems, after the QP has registered the detailed plan for provision of temporary toilets with the CBPD (NEA).įorm B (Application to work in Public Sewer) is to be submitted if it involves a new connection to the existing sewer. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |